Z 086

LOS ALTOS, CA
PROJECT SIZE: 114,000 SQUARE FEET OVER 21 BUILDINGS
EXISTING ROOFING HAD FAILED
PONDING WATER WAS TRAPPED ON THE ROOFS, PRIMARILY IN THE CORNERS, BECAUSE OF SETTLING OF THE SUBSTRATE.
THE SOLUTION WAS TO RESLOPE ROOFS WITH FOAM TO GET WATER TO DRAIN AT ATRIUMS.
SEVERAL ATRIUMS HAD LARGE ROLLAMATIC SKYLIGHTS WHICH NEEDED TO BE LIFTED AND PUT BACK IN PLACE