DCIM100MEDIA

SAN CARLOS, CA.
PROJECT SIZE: 23,000 SQUARE FEET
THE ROOF HAD SOME LEAKS DUE PRIMARILY FROM PONDING WATER
EXTRA FOAM WAS SPRAYED AT PERIMETER AND MIDDLE CHANNELS TO CREATE POSITIVE SLOPE TO SCUPPER DRAINS.
THE FLAT AREA OF THE ROOF WAS ALSO HOLDING WATER SO A FOAM RIDGE CENTERLINE WAS SPRAYED TO SLOPE WATER TO THE SIDES OF THE BUILDING.